  • LOWER MID RAWAKHOLA HYDRO POWER PROJECT LTD.

Lower Mid Rawakhola Hydropower Project




Project Overview

Project: LMRKHEP Type: Run-of-River (RoR) Capacity: 4.00 MW Location: Khotang, Nepal Status: PPA Signed

Lower Mid Rawakhola Hydropower Project (LMRKHPP) is a run-of-the-river hydropower project located in Rakha Bangdel and Sapteswor of Khotang District, Koshi Province, Nepal. The project operates with a net head of 122.93 m and features an installed capacity of 4.00 MW.

Its estimated annual energy generation is 24.08 GWh, which includes 3.62 GWh of dry energy. The project is being developed under the BOOT (Build, Own, Operate, and Transfer) mechanism. Generated power is planned to be evacuated through the under-construction Baghshila Substation via an approximately 7 km, 33 kV transmission line.

Project At A Glance

Location
Rakha Bangdel, Sapteswor, Khotang, Koshi Province, Nepal
Type
Run-of-River (RoR)
Capacity
4.00 MW
Annual Generation
24.08 GWh (3.62 GWh Dry)
Developer
Lower Mid Rawakhola Hydropower Project Limited
Expected Completion
June 01, 2026
Estimated Cost
NRs. 833.543 Million
PPA Status
PPA Signed