- info@rawakholahydro.com
- rawakholahydro@gmail.com
- LOWER MID RAWAKHOLA HYDRO POWER PROJECT LTD.
Middle Molung Khola Small Hydropower Project (MMKSHP) is a run-of-the-river hydropower project located in Sunkoshi Rural Municipality Ward No. 8 of Okhaldhunga District, Koshi Province, Nepal. The project has a net head of 90 m and an installed capacity of 7.5 MW.
Its estimated annual energy generation is 35.78 GWh (with 34.45 GWh saleable), comprising 11.02 GWh dry energy and 24.76 GWh wet energy. The project is being developed by Suvarambha Hydropower Pvt. Ltd., and generated power is planned to be evacuated through a 10 km, 33 kV transmission line to the Aayo Molung Substation and a 20 km, 132 kV line to the Tingla Substation.